South Central Railway commissions second railway longer loop line at Andhra's Navabpalem

South Central Railway has commissioned a longer loop line at Navabpalem station

Infrastructure    16-Sep-2021
Total Views |
New Delhi, September 16: The South Central Railway / SCR has commissioned a longer loop line at the Navabpalem station in the Vijayawada-Visakhapatnam section. 

MIR_1  H x W: 0
 
This is the second such line constructed in this zone. The first one was built at the Bikkavolu station. The new facility is to help the SCR to enhance train operations, ease the congestion and also accommodate long-haul goods trains with additional wagons.
 
 
 
In a press release, the SCR official spokesperson, Ch Rakesh, said the loop lines are constructed at stations in order to handle more trains and to ease out the train operations. The loop lines are normally built with the length of 750 metres, that could accommodate a full-length goods train with numerous engines.
 
Also Read | Indian Railways puts forth policy to lease, sell coaches to Private Parties to run theme-based tourist circuit trains
 
With the increasing need to transport huge quantities at a go, handling longer trains with more number of wagons is a necessity. To mitigate this problem, Indian Railways has been encouraging the construction of longer loop lines of around 1,500 metres (double the length of existing loop line.
 
Also Read | Frequency of Champaran Satyagraha Express increased to Bi-weekly
 
The Ministry of Railways earlier accorded sanction for the construction of longer loops at 6 different stations in the Vijayawada Division viz - Bikkavolu, Navabpalem & Elamanchili in Vijayawada-Visakhapatnam section, and Nidubrolu, Ammanabrolu and Bitragunta in the Vijayawada-Chennai section.