6-Lane tunnel at Khambatki Ghat on Pune-Satara highway to be completed by 2023

Gadkari said the tunnel is going to enhance connectivity and most importantly, provide direct benefits to the commuters through their Value Over Time (VOT) and Value Over Cost (VOC) savings.

Infrastructure    06-Jul-2022
Total Views |
Pune, July 6: The new 6-Lane tunnel at Khambatki Ghat on Pune-Satara highways (NH-4) is a twin tunnel with 3 lanes each & currently under construction is in full progress, informed Union Minister for Road Transport and Highways Nitin Gadkari.

Tunnel
 
He said the existing 'S' curve in Satara-Pune direction shall be completed soon that would lead to drastic reduction in accident risks. The total capital cost for the 6.43 km long project is approximately Rs 926 Crore and is expected to be completed by March 2023.
 
 
Gadkari said today, our country is witnessing unprecedented infrastructural transformation under the leadership of Prime Minister Narendra Modi & unfolding 'Prosperity Through Connectivity'. He said New India Demands World Class Infrastructure.

Gadkari said the tunnel is going to enhance connectivity and most importantly, provide direct benefits to the commuters through their Value Over Time (VOT) and Value Over Cost (VOC) savings.
 
 
The Minister said average travel time at Pune-Satara and Satara - Pune stretch through Khambataki Ghat is 45 minutes and 10-15 minutes respectively. With the completion of this tunnel, average travel time shall be reduced to 5-10 minutes.